Showing posts with label walk in shower. Show all posts
Showing posts with label walk in shower. Show all posts

Tuesday, August 04, 2020

A Busy Week

Two infusions down. Two left to go. Several days after infusion I feel like I was in a big fight and got the **** beat out of me because I am so sore! Yea, a new side effect! LOL.

Summer has definitely hit the South! We had a mild beginning and it was quite comfortable but now the heat and humidity have cranked up to make going outside for long periods, unbearable! Luckily, we have been having some monster thunderstorms each evening to cool things off a bit.

What a busy, busy week!

No finish on Bee Skep yet but I was able to work on it more and the nurse put my IV in a better spot so it did not hinder my stitching. I do not have an update this week but I am getting close to a finish if I can ever get past THAT house! Unfortunately I haven't been able to stitch much while at home due to all the busy-ness going on!

In my last post, I showed a sample picture of the walk in shower we want to get. We are still looking for someone to do that job.There are a few smaller things to do in our bathroom like new faucets for the sink, light fixtures and paint.

I also mentioned that the kitchen has a lot of work to be done. My range died on me last week so we made a trip to the appliance store to put our order in. Did you know that there is an appliance shortage? What I used to get delivered in just two days at the most, now takes a month! There is also a shortage of electrical items (wiring, switches, ect) and pressure treated wood (not to mention change). That figures! We also ordered our counter tops, kitchen sink, new faucets for our bath and the kitchen plus I bought some new glass globes for several ceiling fans.

While we were out looking at appliances, I picked up new light fixtures for the master bath vanity and a new pendant light for the dining area.

We have discussed the outside improvements. We would like to put in a walk way leading from the drive way around the back of house to the deck. When it rains, there are so many puddles to jump over and it would make it much easier when we have groceries to bring in. I would like to have several raised planting beds for veggies, herbs and a few flowers! So we had a guy come out and give us an estimate for these jobs.The walk way was a lot more expensive than we had planned so it looks like we will be puddle jumping a while longer until we find someone with a better price or a DIY project!

We decided that we did not want a big remodel or anything fancy. We just want to make what we have comfortable, convenient and livable.

Until next time may you have simple days, an uncluttered heart and stay well.

Friday, July 24, 2020

A Long Week

My infusions have started. One down, three to go. The doctor is spacing them out further each year. I started at every 6 months but it was not helping so we started doing them every 5 months which made a big difference! My Vasculitis went quite and I have not had a flare since November 2016. We went back to every 6 months during 2020 and so far there have been no problems. If all goes well, we will change them to every 7 months next year.

After my coffee that the infusion nurse always has for me, getting hooked up and my Benedryl nap, I began to stitch some. No updates pictures of the Bee Skep this week because I wasn't able to stitch much due to location of the IV.  I hope to have a big update next week!

I am not a fast stitcher. I admit it. I take breaks. Sometimes the breaks are because of hand cramps and other times they are just because. Period. I see other stitchers who get two or three pieces completed a month. I could probably do that if I decided to but I am happy to just putter along. LOL.

While window shopping over at Etsy, I ran across this wonderful PDF file called Feed Your Soul. I know, I know. I don't need another piece to add to my stash but my heart just wasn't going to listen to logic! I will finish up Bee Skep before starting on this. I have seen several other "soon to be released" pieces that I know will just have to become a part of my stash family!



Last week, we mozied on down to our home improvement store for some ideas. We have been getting estimates on some of the things we want to do around the house. I am so excited that these are going to finally become a reality instead of just  wishes in my mind! Everything is picked out and we know exactly what we want but we are prepared to change if needed after we start getting quotes. Now to get prices and start!

First things first. We have both been wanting a walk in shower for a good while. Since my hip went bad and I had the hip replacement, climbing in and out of that tub has become as tiring as climbing a mountain plus my balance isn't quite the same as it was before. I looked and looked at pictures and finally found what I want (with a few changes).

Our tub and toilet are located like the one in this picture. I LOVE LOVE LOVE this shower. The changes I have made are 1. just a sheet of shower glass (no fancy cut outs), 2. nice clean white subway tile all around,  3. several safety bars and 4. an extra shelf or two for soaps and shampoos. This is just a sample picture so I can show the contractor what I basically want after we find the right person to do it.



My kitchen is a big "must do" on our list. For such a small room in the house, it probably has the most to be done!

There are a few other improvements we are still checking on for outside. It's amazing how fast a "to do" list will grow over the years if left unattended!  I will be sure to share as we get started!

Until next time may you have simple days, an uncluttered heart and stay well.